Right chemistry
Built for prismatic LFP, not pouch NMC. No failures surfacing in year three.

BESS Manufacturing · REI Expo 2026, Booth A01
Cell to container across six stages and two halls. 4.2 GWh per year at 12 PPM. Engineered and serviced in India.
Pick a day. Our solar team confirms your slot within one business day.
The decision most BESS makers get wrong

Built for prismatic LFP, not pouch NMC. No failures surfacing in year three.
Cooling plate, leak test and weld checks run in-line, not after.
IEC 62619, ALMM and UN 38.3 built into the line. Your PLI claim depends on it.
What the line covers

Most vendors deliver one hall. Novus delivers both. Scales from 50 MWh to 500+ MWh per year.
Testing & Traceability
Testing systems for battery cells, modules and packs—from laboratory and production-line testing to pack end-of-line verification.

Laboratory and production-line battery cell testing, including charge/discharge testing with an integrated temperature chamber.

Testing solutions for modules and packs across battery-powered equipment, vehicles and energy storage applications.

End-of-line testing for commercial and industrial energy storage, large energy storage batteries and battery clusters.
Air-tightness testing optional
Connect testing and production records to support quality checks and traceability across the configured line.
What's included
Upcoming Event
Bring your cell format and GWh target to REI Expo 2026, Hall 16, Booth A01, 22 to 24 October. Our BESS engineers will size the line with you.
BESS FAQ
Novus Hi-Tech's BESS team is at Hall 16, Booth A01, REI Expo 2026, India Expo Mart, Greater Noida, from 22 to 24 October 2026. Engineers discuss cell-to-container line design, throughput and PLI documentation. Book a slot through the form on this page to meet a BESS line specialist.
A BESS pack must last 15 to 20 years and thousands of cycles. EV lines tolerate weld, BMS and thermal variation that can cause grid storage failures after year three. A BESS line needs prismatic LFP setup, in-line cooling and leak testing, and IEC 62619, ALMM and UN 38.3 compliance from pack one.
The Novus 12 PPM reference line delivers 4.2 GWh per year using 314 Ah prismatic LFP cells, three shifts and 300 working days. Targets are first pass yield of 98% or more, final yield of 99.5% or more and uptime of 98% or more. Configurations scale from 50 MWh to 500+ MWh per year.
Share your cell format, GWh target and site status. We size the line and map your first 30 days.
Making modules too? See solar PV manufacturing lines